13 May Important Causes of Delayed Projects in Saudi Arabia vs. PIPS: A University Campus Case Study
By Majed Alzara, Jacob Kashiwagi, Dean Kashiwagi, Abdulrahman Al-Tassan
March 2016
Abstract
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays. The University was experiencing delays from 50% to 150%. The delay factors were gathered from the University Projects Director. The University delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified nine causes of delays that both studies documented. The study also proposes a solution to minimize the nine major delay factors. A literature research identified one construction management method, the Performance Information Procurement System (PIPS), has documented multiple times its ability to improve project performance and minimize delays. Key Words Project delay, public construction, Saudi Arabia, Best Value, PIPS.
This content is locked
Become a Member to unlock this resource »Free Member
- Connect with Best Value peers and leadership
- Find upcoming conferences
- Learn about the Best Value Approach
- Read the latest news
- Access to Academic & Research papers
PBSRG Member
- Free online B/B+ training material for 3 months
- Exclusive access to videos and conferences
- A/A+ level coaching from certification board members