Project Overview

The project includes the installation of supply and return piping from the existing stub-ins in the fleet garage to the heat pump room. Four (4) pumps, a heat exchanger and two (2) three-way control valves are to be installed in the heat pump room. Four main piping headers and 28 three-way control valves are to be installed in the mezzanine area above the heat pump room. Piping to connect the heat pumps to the headers and the three-way valves on the mezzanine is also required.

Schedule

NO End Date Task
1 11/22/2010 Project Announcement
2 12/06/2010 Pre-Proposal/Education Meeting
3 12/22/2010 Submittals Due
4 12/29/2010 Potential Best-Value Firm Notification
5 01/05/2011 Pre Award Kickoff Meeting
6 01/21/2011 Pre-Award meeting
7 01/25/2011 Board Award

Bidding / Proposal Information

All information is removed once bids are submitted. To obtain this information, please contact the client or the PBSRG


« Back to Rochester Public Utilities


Back to top