« Back to Rochester Public Schools / ISD 535

Washington ES

Project Overview

General Contract: Work includes minor earthwork, exterior concrete slabs, exterior carpentry work, roof patching, wall and ceiling demolition and repair for mechanical work, minor interior remodeling, kitchen remodeling, and replacement of acoustic ceilings throughout building.

Mechanical Contract: Work includes replacement of water heater, domestic water piping, new flush valves, urinals and toilets, replacing sinks, and removing unit ventilators, boilers, steam system, air handling units, and installing new pre-purchased boilers, chiller, thermal energy storage system, DOAS units, air handling unit, and displacement terminal units. Furnishing and installing new ductwork, new piping, new pumps, and new energy management system. Modifications to fire protection system will be required for new ceilings and lighting.

Electrical Contract: Work includes replacing light fixtures throughout a portion of the building along with switching and circuiting modifications, replace exit lights, fire alarm system alterations, replace exterior building security lighting, electrical modifications required by mechanical equipment modifications to include providing a new 480 V service, and disconnect and reconnect electrical service to ceiling mounted equipment due to ceiling replacement. This project will take place at Washington Elementary School, located at 1200 11th Ave. Northwest. Preliminary plans and details can be found in Exhibit 1.

Schedule

# End Date Task
3/16/11 Project Annoucement
3/18/11 RFP Released
4/5/2011 Pre Proposal Meeting (MANDATORY FOR GENERAL CONTRACTORS)
4/12/11 Last Day for Questions
4/19/11 Proposals Due (2:00 PM Minnesota Time)
4/21/11 Interviews
4/21/11 Identification of Potential Best-Value
4/25/11 Pre-Award Kick Off Meeting
5/3/11 Board Approval
5/4/11 Project Award
8/19/11 Anticipated Substantial Completion Date

Award Information

Vendor Name: GC Knutson Construction
Mech. – HiMEC Mechanical
Elec. – Ryan Electric
Estimated Budget: $3,000,000
Awarded Cost: GC $592,200
Mech.
$ 1,232,100
Elec. $324,176
Awarded Duration: GC 107 Days
Mech.
149 Days
Elec. 107 Days
Detailed Award Info: GC Award Info
Mech. Award Info
Elec. Award Info
Project Risks: GC Risks
Mech. Risks
Elec. Risks

Close-Out Status - GC

Vendor met proposed schedule: Yes
Vendor met proposed cost: Yes
Vendor met purposed quality/customer satisfaction: Yes
Final customer rating of PIPS (10 max): 10
Final rating of contractor (10 max): 10

Close-Out Status - Mech.

Vendor met proposed schedule: Yes
Vendor met proposed cost: Yes
Vendor met purposed quality/customer satisfaction: Yes
Final customer rating of PIPS (10 max): 10
Final rating of contractor (10 max): 9.75

Close-Out Status - Elec.

Vendor met proposed schedule: Yes
Vendor met proposed cost: Yes
Vendor met purposed quality/customer satisfaction: Yes
Final customer rating of PIPS (10 max): 10
Final rating of contractor (10 max): 10