PWTOC Phase 5

Project Overview

The City of Rochester, Minnesota, the Owner, is receiving Best Value Proposals for the furnishing of all labor, materials, equipment, etc., necessary for the complete construction of the Rochester Public Works and Transit Operations Center Phase 5 – Transit Fleet Garage.  This project consists of an addition to the existing Public Works and Transit Operations Center.  Major work elements and assemblies for this phase of the work include but are not limited to the following:  site pavements and ground covers; site amenities including site fencing; concrete frost depth foundations with a concrete slab on grade on grade floor structure; steel structure frame with masonry cavity wall and precast architectural wall panel enclosures, bar joist/steel roof deck with membrane roof covering system; interior fit-up and finishing; procurement and installation of operational equipment; ventilation systems; plumbing systems; fire protection systems; electrical power systems; and internal lighting.

Original site grading, external pavements and landscaping and construction of the existing Public Works and Transit Operations Center were completed in August 2011.

All work shall be in accordance with the intent of the drawings, specification and regulations for said project as prepared by TSP, Inc., 1500 Highway 52 N, Rochester, MN 55901.

This project is located at: 4300 East River Road NE, Rochester, MN,  55906.

BID DOCUMENT AVAILABILITY: Interested contractors may view and purchase documents for bidding by going to the Franz Reprographics website www.franzrepro.com and selecting the Franz Public Plan Room. Please select project “Rochester Public Works and Transit Operations Center – Phase 5 Transit Fleet Garage” from the list of public projects.  Once you have selected the project, please review the Bid Details for information on ordering documents.

Award Information

Vendor Name: Knuston Construction
Estimated Budget: $7.80 Million
Awarded Cost: $6.96 Million
Awarded Duration: 257 days
Detailed Award Info: Public Works and Transit Phase 5 Award Info
Project Risks Phase 5 Submittal Risks

Note: For other pertinent information regarding proposals, you may wish to consult the client's procurement website.