Slide Rock – WWTP/Restrooms & Maintenance Buildings
Project Overview
Arizona State Parks is requesting proposals from qualified Design-Build firms for professional services at Slide Rock State Park, 6871 N. Highway 89A, Sedona, Arizona 86336 for design, construction, and demolition in compliance with existing regulations as follows:
- Design & build a new waste water Treatment Plant to serve the present & future needs of the Park.
- Design & build two identical new Restroom Buildings to facilitate 2,500 Park visitors per day.
- Design & build one new stock pre-engineered Maintenance Building to facilitate maintenance & storage needs.
- Design & build water, sewer, & electrical utility lines with all necessary appurtenances to ensure a fully functional project.
- Demolition of an existing Clivus-Multrum facility with adjacent Effluent Treatment Bed (ETB).
Schedule
| # | End Date | Task |
| 4/02/08 | Pre-Proposal/Educational Meeting | |
| 4/03/08 | Pre-Proposal Site Visit | |
| 5/01/08 | Proposers Submit Reference Lists | |
| 5/01/08 | Surveys Due | |
| 5/01/08 | Proposals and Risk Assessment & Value Added Plans Due | |
| 5/07/08 | Interviews | |
| 5/08/08 | Identification of Potential Best Value | |
| 5/14/08 | Pre-planning Kickoff Meeting | |
| 6/04/08 | Preplanning and Quality Control Meeting | |
| 6/18/08 | Award |
Bidding / Proposal Information
All information is removed once bids are submitted. To obtain this information, please contact the client or the PBSRG.
Award Information
| Vendor Name: | Fann Environmental, LLC |
| Estimated Budget: | $1,200,000 |
| Awarded Cost: | $1,697,243 |
| Awarded Duration: | 617 Days |